   Solar panels (PV modules) and heat pump installation projects in secondary schools, kindergartens and health care facilities is carried out in accordance with “The State Program on use of  alternative and renewable energy sources in  Azerbaijan Republic” and “State program on socio-economic development of Baku and its settlements in the years of 2011-2013 ”. Electricity and heating supply through the provision of alternative and renewable energy sources will help to save fuel and prevent pollution of the natural environment and also to improve the environmental situation. As the period of  sunlight in Absheron peninsula and the coastal area of the Caspian is equal to 2500 hours, this makes efficient the  production of electricity using solar panels. In the considering projects heat pumps will allow to save electricity. Heat pumps allows to raise the temperature of  low-temperature heat carriers by spending energy from the outside. As a result of the implementation of projects will be created a safe heating system which is important for schools and health care facilities. Electricity and heat supply facilities will operate in automatic mode by applying modern equipment.

Project: installation of solar power plants and heat pumps in 6 same type  secondary schools

Location: Bilasuvar district

Power: 300 kW solar power plants

Power:  708 kW heat pumps

Purpose: to provide 6 schools which is situated in the village of refugees and internally displaced persons from the region of Jabrail with heat and electricity and educate pupils.

Project: Installation of solar power plants and heat pumps indoor sports stadium.

Location: Beylagan district

Power: 50 kW solar power plants

Power: 76 kW heat pumps

Purpose:  to meet energy needs of indoor sport ground that was built in the village for Khodjavand refugees with solar power plants and heat pumps

Project: Installation of solar power plants and heat pumps indoor sports stadium.

Power: 50 kW solar power plants

Power: 76 kW heat pumps

Location: Masally region, Boradigah settlement

Purpose:  to meet energy needs of indoor sport ground of the school № 1 with solar power plants and heat pumps

 

Project: installation of solar panel’s (PV modules) units in boarding school

 Power: 25 kW solar power plants

Location: Baku city, Khazar district, Turkana settlement

Purpose:  to meet a part of the electricity needs of the boarding school with solar panels and to familirize pupils with renewable energy sources

Project: providing of the children's polyclinic with electricity and thermal energy by alternative energy sources

 Power: 35 kW solar power plants

Power: 60 kW heat pumps

Location: Baku city, Surakhany district, Hovsan settlement

 

Project: providing of the medical center with electricity and thermal energy by alternative energy sources

Power: 15 kW solar power plants

Power: 51 kW heat pumps

Location: Baku city, Surakhany district, Hovsan settlement

Mission:  Beside to supply electricity and heat by alternative and renewable energy sources, also to save fuel and prevent pollution of the natural environment, also to help improve the environmental situation

Project: installation of solar panel’s (PV modules) and heat pump’s units in the secondary school № 235

Power: 25 kW solar power plants

Power: 25 kW heat pumps

Location: Baku city, Khazar district

Mission: to create a safe heating system which is important for schools, to use  electricity and heat supply facilities in automatic mode by applying modern equipment.

 

Project: installation of solar panel’s (PV modules) and heat pump’s units in the secondary school № 149

Power: 30 kW solar power plants

Power: 60 kW heat pumps

Location: Baku city, Khazar district

Mission: to create a safe heating system which is important for schools, to use  electricity and heat supply facilities in automatic mode by applying modern equipment.

Project: installation of solar panel’s (PV modules) and heat pump’s units in the secondary school № 320

Power: 25 kW solar power plants

Power: 60 kW heat pumps

Location: Baku city, Garadagh district

Mission: to create a safe heating system which is important for schools, to use  electricity and heat supply facilities in automatic mode by applying modern equipment and educate pupils.

 

Project: installation of solar panel’s (PV modules) and heat pump’s units in the secondary school № 311

Power: 35 kW solar power plants

Power: 20 kW heat pumps

Location: Baku city, Sabunchu district

Mission: to create a safe heating system which is important for schools, to use  electricity and heat supply facilities in automatic mode by applying modern equipment and educate pupils.